" Nuclear Technologies personnel have
been involved in a number of engineering substantiation
projects. The work
carried out has always been of very high quality,
delivered on time and to the complete satisfaction
of the relevant
project
managers"
"I would like to thank you and the
team for the successful
completion of the Engineering Substantiation delivered
on a very tight timescale and to a demanding technical
scope. I know of the long and unsociable hours
that were worked to reduce the delivery timescale to
meet out pressing submission
dates. May I particularly thank you for working with us throughout the
project to define an adequate and robust Engineering
Schedule. I look forward to working
with you again in the future"
" Many thanks for your excellent work
producing the facilitiy modification justifying the extension of the operational
period of the current safety case. The document was very well received by the
Harwell Safety Working Party and in view of the lack of formal guidance available
to you this was a significant achievement. I found the quality and timely completion
of the work to be of a high standard. Well done"
"It is
with some pleasure I am for once writing to a contractor to congratulate
them on a job well done, and to thank them for their support during
a project. Nuclear Technologies has provided a professional and comprehensive
service to enable the programme to be maintained and for all the
major
milestones to be achieved."
" I would like to thank you
for all the work which went into producing the LCBL. This was a
massive task which has been completed to time and represents a
major step in our preparations for the LMU. It was an excellent
achievement"
" Following completion of
the Technical Writer contract, I am writing to acknowledge
the contribution made by Nuclear Technologies on this
work. This was made a particularly difficult task in
view of the short timescales involved and the huge
amount of information that had to be collated and presented.
Not only did Nuclear Technologies successfully carry
out this task but also provided the information required
to the level I originally intended to be produced for
the next phase of the project!"
" I would like to thank you for your work on
the presentation for the NTWP assessment. The LMU team
were very impressed with the quality of the presentations
and the understanding of the programme which was demonstrated.
I am sure that the presentations helped in securing
the score of 3.0"
" The work involved Nuclear Technologies investigating
a number of options for decommissioning several UKAEA
facilities. Nuclear Technologies were required to use
multi-criteria qualitative and quantitive arguments
to identify and characterise preferred options. The
study encompassed technical requirements, cost estimates
incorporating UKAEA’s PRICE estimating system
and project risk assessments. All aspects of the work
were completed to the satisfaction of the UKAEA project
manager."
"The report was comprehensive and delivered
on time. The interaction between myself and NTL staff
has been good and has contributed to the quality
of the report. I would not hesitate to use NTL for
similar work in the future."
" The Optioneering meeting
was well structured and ensured that the outcome was
an unbiased and fair assessment of the options discussed.
The final report aptly recorded the optioneering meeting
and provided a good description of the facilities and
processes. I hope to use the report in the near future
to propose changes, proving that your efforts have
been worthwhile and greatly appreciated"